top of page
Maercon logo

MAERCON LIMITED

Projects

Paradise Park Aerial.png

PHOTOVOLTAIC INSPECTION

This 51.5 Megawatt photovoltaic power plant (solar farm) plays a key part in Jamaica's electricity supply and renewable energy future; as such, ensuring its reliable operation is paramount.

   To help ensure this reliable...

IMG_8053.JPEG

Warehouse Remodel

One of the largest food processors in the Caribbean tasked Maercon with transforming this old warehouse into a modern parts storage facility and offices.

20190227_152141.jpg

TRUSS BRIDGE

This 105ft truss bridge and reinforced concrete supports were fabricated and constructed by Maercon in Clarendon, Jamaica; to connect the upper shore of a retention lake to a service pontoon.

red-stripe-depalletizer.jpg

BEVERAGE BOTTLING PLANT

Over 25,000 square feet of concrete slab was cast and interlaced with over 480 feet of stainless steel drains. This provided the base for a vitrified tiling solution...

red-stripe-compressor-room.jpg

AIR COMPRESSOR FACILITY

This decades old structure is now the home of several state of the art air compressors, which service a Jamaican beverage production facility that houses...

20190201_172148.jpg

700hp PUMP BASE

To accommodate the installation of three pump skids, each equipped with 700hp motors, Maercon as the fabricator constructed three pump bases with a surrounding bund area. The reinforced concrete pump bases sit atop a foundation covered with HDPE...

© 2022 by Maercon Limited.

  • Facebook Social Icon
  • Instagram Social Icon
bottom of page